CJL Home
About CJL
Projects
Services
News
Contacts
Sitemap
File Transfer
Projects Central Plant
Commisioning Projects
Corporate Projects
Cultural Projects
Energy Projects
Government Projects
Health Care Projects
Higher Education Projects
K - 12 Projects
LEED Projects
Fort Couch Middle School The Project: Fort Couch Middle School
The Upper St. Clair School District in Pittsburgh, PA has embarked on a $22 million renovation of Fort Couch Middle School. Built in the 1960’s and last renovated in 1990, the school had inherent problems with the size of its classrooms and other spaces resulting from a narrow overall building width that limits corridor dimensions. A portion of the existing structure is being demolished and reconfigured, and the school will be significantly expanded. CJL Engineering is providing the Mechanical, Electrical Plumbing and LEED® Engineering Services for this 153,000 sq. ft. project.

CJL Engineering Design Solutions:
• The Photovoltaic (PV) System has been incorporated into the design. The PV panels are
   grid connected and fed into DC to AC inverters which in turn feed a branch circuit
   breaker in one of the 20/208V panels in the school. The PV System provides up to 1400W
   of power before drawing from the utility.
• Lighting Systems incorporate daylight harvesting and dimming controls along with high
   efficiency lighting fixtures to greatly reduce the amount of lighting energy consumed
   in the building. In select classrooms, a web-based monitoring system has been
   implemented that allows the teachers and students to see how much energy is being
   saved in their classroom.
Fort Couch Middle School
Gateway Senior High Auditorium
Gateway Senior High School Auditorium The Project: Gateway Senior High School Auditorium
A major expansion at Gateway Senior High School included a new wing that encompassed an auditorium and music education addition to the existing facility, linked by a concourse. CJL Engineering provided the HVAC,Plumbing and Electrical Systems design for an Expansion / Renovation to the school.

CJL Engineering Design Solutions:
• Theatrical lighting and sound system in the auditorium.
• New chilled water air conditioning system connecting multiple buildings.
• Central station air handling units.
• Upgrade existing medium voltage electrical distribution system.
• Plumbing and fire protection systems.










Logan Middle School The Project: Logan Middle School
The new Logan Middle School was built adjacent to the District’s high school on a 44- acre campus. CJL Engineering designed the school’s Mechanical and Electrical Systems, as well as its advanced Voice / Data / Video Technology Network. The new 139,000 sq. ft. air-conditioned middle school consists of two inter-connected wings. The first contains 52 instructional rooms on two levels and a library. The second wingcontains a 900-seat auditorium, a 700-seat spectator gym, cafeteria and administrative offices.

CJL Engineering Design Solutions:
• Large rooftop central station air-handling units serve the two wings with split-system air
   conditioning.
• Automatic temperature control system
• The Electrical System includes a three-phase, 277 / 480 Volt electrical distribution and
   underground service entrance. A natural gas fueled emergency generator serves the
   emergency lighting and heating system.






Mars Area Senior High School The Project: Mars Area Senior High School
Mars Ares Senior High School received a major building addition in 2004; it included a new Auditorium, classrooms and renovations to the existing facility. CJL Engineering provided the HVAC, Plumbing and Electrical Systems design for an Expansion / Renovation to the school.

CJL Engineering Design Solutions:
• 20,000 sq. ft. of new construction
• New 1,200 seat auditorium with balcony
• Theatrical lighting with sound system
• New Chilled water system
• Central Station air handling units










Punxsutawney Middle School Natatorium The Project: Punxsutawney Middle School Natatorium
16,820 sq. ft. Natatorium to the school. CJL Engineering provided the Mechanical and Electrical engineering design, including all HVAC, Plumbing and Electrical Systems. The addition includes the pool, two locker and shower rooms, lobby and restrooms.

CJL Engineering Design Solutions:
• A new pool dehumidification and water heating air-handling unit resolves the humidity
   and ventilation concerns.
• New hot water heating and ventilating equipment was installed. This included gas-fired
   hot water boilers, pumps, air-handling units, unit ventilators, radiant panels, cabinet
   unit heaters, piping, and insulation.
• The extension of the Plumbing System from the existing school included domestic water, a
   sanitary sewer, a dedicated natural gas service storm sewer.
• New emergency lighting, including engine generator, transfer switch, area protection panel,
   auxiliary equipment and related accessories.






Logan Middle School
Mars Area Senior High School
Punxsutawney Middle School Natatorium
<